Delivery time: 4 weeks
General Parameters
Size (Mounting Interface): NG06 (ISO 4401-03-02-0-94)
Mounting Orientation: Any orientation
Ambient Temperature: -20℃ to +50℃
Mean Time to Functional Failure (MTTFD): 150 years
Weight: 0.9 kg
Hydraulic Parameters
Maximum Operating Pressure: 350 bar
Maximum Flow Rate: 53 L/min
Cracking Pressure: 0.3 bar
Operating Fluid: Hydraulic oil conforming to DIN 51524⋯51525
Fluid Temperature: -20℃ to +80℃
Fluid Viscosity: Allowable range 10–650 cSt; recommended viscosity 30 cSt
Filtration Requirement: ISO 4406 (1999): 18/16/13
PARKER:CM2PPV Specifications
| Delivery time | 4 weeks |
|---|---|
| Size (Mounting Interface) | NG06 (ISO 4401-03-02-0-94) |
| Mounting Orientation | Any orientation |
| Ambient Temperature | -20℃ to +50℃ |
| Mean Time to Functional Failure (MTTFD) | 150 years |
| Weight | 0.9 kg |
| Maximum Operating Pressure | 350 bar |
| Maximum Flow Rate | 53 L/min |
| Cracking Pressure | 0.3 bar |
| Operating Fluid | Hydraulic oil conforming to DIN 51524⋯51525 |
| Fluid Temperature | -20℃ to +80℃ |
| Fluid Viscosity | Allowable range 10–650 cSt; recommended viscosity 30 cSt |
| Filtration Requirement | ISO 4406 (1999): 18/16/13 |
About the PARKER:CM2PPV
The PARKER:CM2PPV is a oil drilling equipment used in industrial automation, control and power systems. It is rated at Delivery time 4 weeks, Size (Mounting Interface) NG06 (ISO 4401-03-02-0-94), Mounting Orientation Any orientation. This oil drilling equipment is supplied as new, original industrial-grade stock. Each unit is identified by manufacturer part number PARKER:CM2PPV for accurate procurement and cross-referencing.
Why source the PARKER:CM2PPV from HDE123
- Verified part number: every PARKER:CM2PPV is checked against its manufacturer specification before shipment.
- 13 confirmed technical parameters available on this page for engineering review.
- Global delivery with clear lead time and commercial invoice for B2B buyers.
- Fast B2B support: send us the equipment model or an existing part number and our engineers confirm compatibility before you order.
Ordering the PARKER:CM2PPV
To order the PARKER:CM2PPV, add it to your cart and complete checkout, or use the Request a Quote form for volume purchases and replacement / cross-reference enquiries. Lead time: typically 3–10 working days for in-stock items, subject to confirmation. Worldwide shipping is available and a commercial invoice is provided for customs.
