PARKER:CM2PPV

promotions

Hde Shopping Event

Sale_coupon_15

$36.00

99 in stock

99 in stock

  • store Pick up from the HDE Store

Located in:Xi'an City China

  • delivery car Courier delivery

Our courier will deliver to the specified address

  • Courier delivery

DHL / Fedex / UPS / By Air 

Payment Methods:

payment methods

Delivery time: 4 weeks
General Parameters
Size (Mounting Interface): NG06 (ISO 4401-03-02-0-94)
Mounting Orientation: Any orientation
Ambient Temperature: -20℃ to +50℃
Mean Time to Functional Failure (MTTFD): 150 years
Weight: 0.9 kg
Hydraulic Parameters
Maximum Operating Pressure: 350 bar
Maximum Flow Rate: 53 L/min
Cracking Pressure: 0.3 bar
Operating Fluid: Hydraulic oil conforming to DIN 51524⋯51525
Fluid Temperature: -20℃ to +80℃
Fluid Viscosity: Allowable range 10–650 cSt; recommended viscosity 30 cSt
Filtration Requirement: ISO 4406 (1999): 18/16/13

PARKER:CM2PPV Specifications

Delivery time4 weeks
Size (Mounting Interface)NG06 (ISO 4401-03-02-0-94)
Mounting OrientationAny orientation
Ambient Temperature-20℃ to +50℃
Mean Time to Functional Failure (MTTFD)150 years
Weight0.9 kg
Maximum Operating Pressure350 bar
Maximum Flow Rate53 L/min
Cracking Pressure0.3 bar
Operating FluidHydraulic oil conforming to DIN 51524⋯51525
Fluid Temperature-20℃ to +80℃
Fluid ViscosityAllowable range 10–650 cSt; recommended viscosity 30 cSt
Filtration RequirementISO 4406 (1999): 18/16/13

About the PARKER:CM2PPV

The PARKER:CM2PPV is a oil drilling equipment used in industrial automation, control and power systems. It is rated at Delivery time 4 weeks, Size (Mounting Interface) NG06 (ISO 4401-03-02-0-94), Mounting Orientation Any orientation. This oil drilling equipment is supplied as new, original industrial-grade stock. Each unit is identified by manufacturer part number PARKER:CM2PPV for accurate procurement and cross-referencing.

Why source the PARKER:CM2PPV from HDE123

  • Verified part number: every PARKER:CM2PPV is checked against its manufacturer specification before shipment.
  • 13 confirmed technical parameters available on this page for engineering review.
  • Global delivery with clear lead time and commercial invoice for B2B buyers.
  • Fast B2B support: send us the equipment model or an existing part number and our engineers confirm compatibility before you order.

Ordering the PARKER:CM2PPV

To order the PARKER:CM2PPV, add it to your cart and complete checkout, or use the Request a Quote form for volume purchases and replacement / cross-reference enquiries. Lead time: typically 3–10 working days for in-stock items, subject to confirmation. Worldwide shipping is available and a commercial invoice is provided for customs.